The data group level is the most common level at which an issue can occur during a switch. The most common problems result from not running daily audits and not noticing object entries with a *DELAYED status before starting the switch.
From the Work with Data Groups display (WRKDG command) you can watch the status of data groups as they are ended in a controlled manner, switch directions, and are enabled or disabled as required for the new primary node.