Monitoring data groups during a switch - assure_mimix - 10.0

Assure MIMIX Operations with PowerHA User Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Operations with PowerHA User Guide
Topic type
How Do I
Copyright
2023
First publish date
2009

The data group level is the most common level at which an issue can occur during a switch. The most common problems result from not running daily audits and not noticing object entries with a *DELAYED status before starting the switch.

From the Work with Data Groups display (WRKDG command) you can watch the status of data groups as they are ended in a controlled manner, switch directions, and are enabled or disabled as required for the new primary node.