Run Unplanned Failover Procedure dialog for 3-node non-clustered broadcast replication groups: Create snapshot on failover server - assure_mimix - assure_mimix_for_aix - 6.0

Assure MIMIX for AIX Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software for AIX
Version
6.0
ft:locale
en-US
Product name
Assure MIMIX for AIX
ft:title
Assure MIMIX for AIX Guide
Copyright
2025
First publish date
2003
ft:lastEdition
2025-10-08
ft:lastPublication
2025-10-08T06:18:25.453000
L1_Product_Gateway
Integrate
L2_Product_Segment
IBM Infrastructure
L3_Product_Brand
Precisely Assure
L4_Investment_Segment
IBM i HA
L5_Product_Group
IBM i HA
L6_Product_Name
Assure MIMIX for AIX

Because the production server is not available, you may need to rollback the failover server before failing over. Validating the rollback location using a snapshot is recommended.

To create a snapshot:

  1. Specify a location in the rollback window on the new production server.

  2. Click OK, to confirm the snapshot location and create a snapshot.

  3. Mount the file systems and run your applications with the snapshot to validate the rollback location.

  4. You may need to use more than one snapshot to find a valid location.