The failback procedure is used to move production back to the configured production server. The failback procedure is only available when the replication group is in a failed over state. The Steps portlet shows the steps for the Failback procedure selected in the Procedures portlet.
-
Select Run on the Action toolbar on the Steps portlet.
Note: The Run Failback Procedure dialog displays. This is the only dialog displayed when running a Failback procedure for a clustered replication group. The steps are run automatically by the cluster. -
Click OK to begin the automated failback procedure. For the remaining steps, the following single command is executed by Assure UI portal on the production server: cli.sh [<general options>] moveApplication [<command options>] <ApplicationName>