This procedure returns operations to the original production system.
Before using this procedure, consult your runbook for any additional procedures that must be performed when switching to the production system
-
Shut down all active applications that are reading or updating replicated objects from the production and backup systems.
Do the following from the original production system:
-
Ensure that all transactions have been applied by doing the following:
- Select option
6(Work with data groups) from the MIMIX Basic Main Menu and press Enter. - For each data group, select option
8(Display status) and ensure that the Unprocessed entry counts for both database and object apply have no values.
- Select option
- From the MIMIX Basic Main Menu, select option
5(Start or complete switch using Switch Asst.). - You will see the Confirm Switch to Production confirmation display. Press F16 to confirm your choice to switch MIMIX and specify switching options.
- The Run Switch Framework (RUNSWTFWK) command appears. The default Switch
framework and the value *PROD for the Switch framework process are
preselected and cannot be changed. Do the following:
- You can change values for other parameters as needed.
To start the switch, press Enter.
-
Consult your runbook to determine if any additional steps are needed.