Changing when automatic audits are allowed to run - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Operations Guide
Copyright
2026
First publish date
1999
ft:lastEdition
2026-01-13
ft:lastPublication
2026-01-13T10:54:54.977000
L1_Product_Gateway
Integrate
L2_Product_Segment
IBM Infrastructure
L3_Product_Brand
Precisely Assure
L4_Investment_Segment
IBM i HA
L5_Product_Group
IBM i HA
L6_Product_Name
Assure MIMIX

This topic describes how to change scheduling criteria for when automatic audits will run. To effectively audit your replication environment you may need to fine-tune when MIMIX is allowed to automatically submit prioritized objects audits and all-objects audits. MIMIX service providers are trained to provide a robust audit solution that meets your needs.

For both types of auditing, consider:

  • How much time or system resource can you dedicate to audit processing each day, week, or month?

  • How often should all data within the database be audited? Business requirements as well as time and system resources need to be considered.

  • Does automatic scheduling conflict with regularly scheduled backups?

  • Are there jobs running at the same time as audits that could lock files needing to be accessed during recovery?

For all-objects auditing, also consider: