Identifying the last entry inspected on the target system - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Operations Guide
Copyright
2025
First publish date
1999
ft:lastEdition
2025-06-17
ft:lastPublication
2025-06-17T11:00:28.458571

For each target journal inspection process, you can view details that identify the last journal entry inspected and identify the last entry in the current journal receiver.

Do the following:

  1. From MIMIX Intermediate Main Menu, select option 2 (Work with Systems) and press Enter.

  2. The Work with Systems display appears. Type 11 (Jrn inspection status) next to the system you want and press Enter.

  3. The Work with Journal Inspection Status display appears. Type 5 (Display) next to the journal definition on the system you want and press Enter.

  4. The Display Journal Inspection Status Details display appears.

    • The following fields identify the currently attached journal receiver and the last entry in the current receiver: Journal, Journal receiver, Last journal entry sequence. and Last journal entry time.

    • The Target journal inspection fields identify the last entry processed by target journal inspection.