Determining when the last switch was performed - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Operations Guide
Copyright
2026
First publish date
1999
ft:lastEdition
2026-01-13
ft:lastPublication
2026-01-13T10:54:54.977000
L1_Product_Gateway
Integrate
L2_Product_Segment
IBM Infrastructure
L3_Product_Brand
Precisely Assure
L4_Investment_Segment
IBM i HA
L5_Product_Group
IBM i HA
L6_Product_Name
Assure MIMIX

Replication environments rarely remain static. Therefore, best practice is to perform regular switches to ensure that you are prepared should you need to perform one during an emergency.

The Last switch field indicates compliance with best practices. The status of the field is highlighted to indicate the following:

  • Yellow - The number of days since the last switch is at the limit of what is considered to be best practice. This threshold is determined by the Switch warning threshold policy.
  • Red - The number of days since the last switch is beyond what is considered to be best practice. This threshold is determined by the Switch action threshold policy.