Additional considerations when ending replication - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Operations Guide
Copyright
2026
First publish date
1999
ft:lastEdition
2026-01-13
ft:lastPublication
2026-01-13T10:54:54.977000
L1_Product_Gateway
Integrate
L2_Product_Segment
IBM Infrastructure
L3_Product_Brand
Precisely Assure
L4_Investment_Segment
IBM i HA
L5_Product_Group
IBM i HA
L6_Product_Name
Assure MIMIX

The following questions will help you determine additional options you may need when ending replication. All methods of ending replication can accomplish these activities, but in some, the action is not default or may require additional programming.

  • Do processes need to end in a controlled manner or can they be ended immediately? Both commands support these options. For more information, see Ending immediately or controlled 

  • Do you need to end only a subset of the replication processes? Only ENDDG supports ending selected processes. For more information see Ending all or selected processes.

  • Do RJ links also need to end? Both replication and system manager processes use RJ links. In most cases, RJ links for either purpose can remain active. For scenarios when you should end the RJ links, see When to end RJ links.