Displaying the procedures for a node - assure_mimix - 10.0

Assure MIMIX Administrator Reference

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Administrator Reference
Copyright
2024
First publish date
1999
ft:lastEdition
2024-12-27
ft:lastPublication
2024-12-27T06:03:17.518000

Do the following:

  1. From the MIMIX Intermediate Main Menu, type 2 (Work with systems) and press Enter.

  2. From the Work with Systems display, do one of the following:

  • To see a list of the procedures for nodes, type 20 (Procedures) next to the system you want and press Enter.

  • To see the status of procedures that run on a node, type 21 (Procedure Status) next to the system you want and press Enter.