When you start the synchronization step of the switch operation, MIMIX starts the selected data groups with the original backup system as the source system. Also, the user backup environment is started on the remote system
The following table shows the process flow that occurs when the RUNSWTFWK PRC(*SYNC) command is invoked:
RUNSWTFWK PRC(*SYNC) Events |
Success Status or Messages |
Fail Status or Messages |
---|---|---|
Check the switch status to determine if the system is in the correct state to run. |
SBSB |
LVE8004 |
Call the STRBCKUP user program to start backup on the production system. |
LVE8006 SSBF |
|
Check the local data area for a successful indicator, if successful set the status code. |
SSTR |
LVE8007 SSBF |
Call the DGSELECT user program to determine which data groups to start, if end immediate is selected. |
LVE8003 SEST |
|
Run STRDG command for selected data groups. |
SCMP |