Events and status: Starting the switch synchronization - assure_mimix - 10.0

Assure MIMIX Monitor Reference

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
ft:locale
en-US
Product name
Assure MIMIX
ft:title
Assure MIMIX Monitor Reference
Copyright
2023
First publish date
1999
ft:lastEdition
2024-08-07
ft:lastPublication
2024-08-07T11:10:39.245000

When you start the synchronization step of the switch operation, MIMIX starts the selected data groups with the original backup system as the source system. Also, the user backup environment is started on the remote system

The following table shows the process flow that occurs when the RUNSWTFWK PRC(*SYNC) command is invoked:

Table 1. RUNSWTFWK synchronization

RUNSWTFWK PRC(*SYNC) Events

Success Status or Messages

Fail Status or Mes­sages

Check the switch status to determine if the system is in the correct state to run.

SBSB

LVE8004

Call the STRBCKUP user program to start backup on the production system.

LVE8006

SSBF

Check the local data area for a successful indicator, if successful set the status code.

SSTR

LVE8007

SSBF

Call the DGSELECT user program to determine which data groups to start, if end immediate is selected.

LVE8003

SEST

Run STRDG command for selected data groups.

SCMP