After creating a project, you can regenerate the input data in the static or dynamic entity in the project.
For a static entity, you regenerate the data to create a sample. For example, if your input entity has one million rows, you can specify a few hundred rows from the source and run the sample in the Control Center while you build the project. Once the project is complete, you can export it to batch and run the full amount of rows.
For a dynamic entity, you regenerate the data to do the following tasks:
- Load a random percentage of records for sampling.
- Modify the input attribute lengths.
- Refresh the data after the source files have been updated.
- Reload the input data, along with the flat file, to include a lesser or greater number of rows. When you add a dynamic entity to a new or existing project, the maximum number of rows used to generate the associated TSQ flat file is 500.
To regenerate input data