Copying an Entity from Profiling - trillium_discovery - trillium_quality - 17.1

Trillium Control Center

Product type
Software
Portfolio
Verify
Product family
Trillium
Product
Trillium > Trillium Quality
Trillium > Trillium Discovery
Version
17.1
Language
English
Product name
Trillium Quality and Discovery
Title
Trillium Control Center
Topic type
How Do I
Overview
Configuration
Reference
Administration
Installation
First publish date
2008

You can copy entities created during profiling activities and paste them in your Quality projects.

To copy an entity from profiling

  1. Click the Entities tab on the Discover bar.
  2. Right-click the entity you want to copy and select Copy Entity to Quality Project.
  3. Click the Develop bar and double-click the Quality project you want to paste the entity to. The project is displayed in the Project View.
  4. Right-click anywhere in the project and select Paste Entity. The entity is displayed in the Project View. If you want to replace the input entity for a process, follow the next procedure.
To replace an entity for a process
  1. Right-click the process for which you want to replace the input entity and select Add new Inputs. If you want to replace the input entity for the project, right-click the first process in the project.
  2. Select the new entity.
  3. Click OK. The new entity is added to the process.
  4. Open the process for editing and select the Schema Editor tab.
  5. In the Schema Editor, select the Regenerate Output Schema check box. The Regenerate Output Schema section becomes available.
  6. In the Regenerate Output Schema section, select the new entity from the Using Input schema drop-down list.
  7. Select Inherit schema and click Apply.
  8. When the confirmation box opens, click OK. The output schema changes to match the new entity.
  9. Click Finish.
  10. Right-click the process and select Apply Schema Changes.
  11. When the confirmation box opens, click OK.
  12. After the schema change is completed, right-click the arrow from the old entity and select Remove this input, and then click OK. The process flow now only links to the new entity.
  13. Right-click the unattached old entity and select Remove Entity from project.
    Note: You can remove an entity from a project only when the entity has been removed from all processes.