Regenerate TSQ Input Data - trillium_discovery - trillium_quality - 17.1

Trillium Beyond The Basics Guide

Product type
Software
Portfolio
Verify
Product family
Trillium
Product
Trillium > Trillium Discovery
Trillium > Trillium Quality
Version
17.1
Language
English
Product name
Trillium Quality and Discovery
Title
Trillium Beyond The Basics Guide
Topic type
How Do I
Administration
Installation
Overview
Reference
Configuration
First publish date
2008
ft:lastEdition
2024-02-22
ft:lastPublication
2024-02-22T07:10:57.278355

When a dynamic entity is used as input to a Quality project, you will at some point need to run the Regenerate TSQ Data job. This will do the following:

  • Refresh the dynamic entity with any updated data in the source file.

  • Specify a sample of data rows with which to work.

  • When you add a dynamic entity to a new or existing project, all data rows in the source are used to generate the associated TSQ flat file. You can regenerate the input data (along with the flat file) to include a sample of rows with which to work.

  • Modify the attribute length of delimited dynamic entities. (See Modify Dynamic Entity Attribute Lengths.)