The following two examples show sample executions of SYNCLIST when MFX load modules appear in a PDS and a PDSE:
JCL when Load Modules are in a PDS
JCL when Load Modules are in a PDSE
Notes:
- The STEPLIB DD statement in above figure (JCL when Load Modules are in a PDS) is not required if the SYNCLINK library is in the system link list. The STEPLIB DD can be removed if the modules in both the SYNCLINK and SYNCRENT libraries are locatable through the system link list and LPA list search.
- The SYSPRINT DD statement assigns the SYNCLIST report to the output device associated with class *.
- The SYSLIB DD statement concatenates the SYNCLINK and SYNCRENT libraries for which a SYNCLIST report is desired.