Generally, we recommend provisioning twice the processing power for a SQL Server machine
than for a Control Center machine that is accessing it. For example, based on the
Control Center specifications above:
- 4 vCPUs as a minimum, 8vCPUS plus for large installations
- 16 GB minimum
- We recommend at least 64GB RAM for large installations
- We recommend 32 GB RAM for installations with large web reporting requirements
- Fast disk (ideally SSD for large environments with multiple Control Centers)