Image Report - Precisely_EnterWorks - EnterWorks - 11.0

EnterWorks Guide

Product type
Software
Portfolio
Verify
Product family
EnterWorks
Product
Precisely EnterWorks
Precisely EnterWorks > EnterWorks
Version
11.0
Language
English
Product name
Precisely EnterWorks
Title
EnterWorks Guide
Copyright
2024
First publish date
2007
Last updated
2025-01-07
Published on
2025-01-07T07:44:20.997000

The Image Report generates a list of any unlinked Digital Assets in DAM.

To start an Image Report job:

  1. Open DamMaster in a Repository View.
  2. Open the More dropdown menu and select Image Report. An Image Report job will be started to run in the background.
  3. To check the status of the Image Report Job, open Job Monitor, select the Image Report job, then click the Job History button on the Job Monitor's activity bar. A Job History window will open and display the completion status of the job.
  4. To download the job log file, click the Log File icon.
  5. To download the Image Report, click the Output File icon.