You can choose to let users or participants assigned to an activity set priorities for work items in TaskManager. Alternatively, you can choose a priority that overrides any previously set priorities.

To specify work item priorities:

  1. If the activity’s editor is not already open, right-click the activity’s icon, and then click Properties in the shortcut menu.

  2. Click the Details tab.

  3. Select a priority from the Work Item Priority list.

  • For the first activity in the flow, to use the priority level set on the flow’s Priority tab, select Default.

For activities within the body of the flow, selecting a priority of Default causes the activity to re-use the same priority level that was used for the previous activity.

  • To configure an activity so that it has no priority, select None.

  • To assign the work item a system-defined priority level, select one of the five available system-defined levels: Lowest, Low, Medium, High, or Highest.

Note: Setting a system-defined priority level for an activity overrides any other priority level assigned to a work item earlier in the flow. The new priority level takes effect when the work item arrives at the activity.