Target implementation checklist - connect_cdc_sqdata - Latest

Connect CDC (SQData) Change Data Capture

Product type
Software
Portfolio
Integrate
Product family
Connect
Product
Connect > Connect CDC (SQData)
Version
Latest
Language
English
Product name
Connect CDC (SQData)
Title
Connect CDC (SQData) Change Data Capture
Copyright
2024
First publish date
2000
ft:lastEdition
2024-09-05
ft:lastPublication
2024-09-05T15:00:09.754973

This checklist covers all the tasks required to preparing the target operating environment and configure Straight IMS to IMS Replication.

# Task Sample JCL
  Prepare Environment
1 Perform the base product installation on the Target System Various
2 Modify PROCLIB Members N/A
3 Verify that the Connect CDC SQData product has been Linked SQDLINK
4 Verify APF Authorization of SQDATA LOADLIB N/A
5 Create ZFS directories if running a Controller Daemon on Target System ALLOCZDR
6 Reserve TCP/IP Ports if running a Controller Daemon on Target System N/A
7 Identify/Authorize Operating User(s) and Started Task(s) N/A
8 Generate Public/Private Keys for Engine, Update Auth Key File on Source System NACLKEYS
  Environment Preparation Complete
  Replication Configuration Tasks
1 Create target IMS database N/A
3 Create straight IMS Replication Script SQDPARSE
4 Prepare Engine JCL SQDATAI
  Replication Configuration Complete
  Verification Tasks
1 Start the IMS Capture agent, CDCzLog Publisher and SQDAEMON on Source System Various
2 Start the Engine on Target System SQDATA
3 Apply changes to the source segments N/A
4 Verify that changes were captured and processed by Engine N/A
  Verification Complete

The following sections focus on the Engine Configuration and communication with the Source platform Controller Daemon. Detailed descriptions of the other steps required to prepare the environment for Connect CDC (SQData) operation are described in previous sections.