Displaying available status history of procedure runs - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Operations Guide
Copyright
2023
First publish date
1999
Last updated
2024-03-12
Published on
2024-03-12T11:06:36.794496

The status of other previously performed runs of procedures may be available on the Work with Procedure Status display, subject to the current settings of the Procedure history retention policy.

To display status of all available runs of a selected procedure, do the following:

  1. From the MIMIX Intermediate Main Menu, select the following:

    • For *NODE procedures, type option 2 (Work with systems).

    • For procedures other than type *NODE, type option 5 (Work with application groups).

  2. Type option 20 (Procedures) and press Enter.

  3. The Work with Procedures display appears. Type 14 (Procedure status) next to the procedure you want and press Enter.

    Note: All available runs for the selected procedure are listed on the Work with Procedure Status display. The last run procedure is at the top of the list. For *NODE procedures, all nodes are included so the *NODE procedure at the top of the list may not be the one for the node you want.
  4. Locate the run of the procedure you want and check the value of the Status column.

Note: To view status of all runs of all procedures, you can either press F20 (Procedure status) from the Work with Application Groups display, press F14 (Procedure status) from the Work with Procedures display, or enter the command: WRKPROCSTS.