Data groups cannot be ended - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Operations Guide
Copyright
2023
First publish date
1999
Last updated
2024-03-12
Published on
2024-03-12T11:06:36.794496

A controlled end for a data group may take some time if there is a backlog of files to process or if there are a number of errors that MIMIX is attempting to resolve before ending.

If you think that a data group is taking too long to end, check the following for possible causes:

  • Check to see how many transactions are backlogged for the apply process. Use option 8 (Display status) on the Work with Data Groups display to access the detailed status. A number in the Unprocessed Entry Count column indicates a backlog. Use F7 and F8 to see additional information.

  • Determine which replication process is not ending. Use the command WRKSBSJOB SBS(MIMIXSBS) to see the jobs in the MIMIXSBS subsystem. Look for jobs for replication processes that have not changed to a status of END. For example, abc_OBJRTV, where abc is a 3-character prefix.

  • Check the QSYSOPR message log to see if there is message that requires a reply.

  • You can use the WRKDGACTE STATUS(*ACTIVE) command to ensure all data group activity entries are completed. If a controlled end was issued, all activity entries must be processed before the object processes are ended.