Switching to the production system - assure_mimix - 10.0

Assure MIMIX Operations Guide

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Operations Guide
Copyright
2023
First publish date
1999
Last updated
2024-03-12
Published on
2024-03-12T11:06:36.794496

This procedure returns operations to the original production system.

Before using this procedure, consult your runbook for any additional procedures that must be performed when switching to the production system

  1. Shut down all active applications that are reading or updating replicated objects from the production and backup systems.

    Do the following from the original production system:

  2. Ensure that all transactions have been applied by doing the following:

    1. Select option 6 (Work with data groups) from the MIMIX Basic Main Menu and press Enter.
    2. For each data group, select option 8 (Display status) and ensure that the Unprocessed entry counts for both database and object apply have no values.
  3. From the MIMIX Basic Main Menu, select option 5 (Start or complete switch using Switch Asst.).
  4. You will see the Confirm Switch to Production confirmation display. Press F16 to confirm your choice to switch MIMIX and specify switching options.
  5. The Run Switch Framework (RUNSWTFWK) command appears. The default Switch framework and the value *PROD for the Switch framework process are preselected and cannot be changed. Do the following:
    1. You can change values for other parameters as needed.
    2. To start the switch, press Enter.

  6. Consult your runbook to determine if any additional steps are needed.