Determining how an activity entry for a create operation was replicated - assure_mimix - 10.0

Assure MIMIX Administrator Reference

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Administrator Reference
Copyright
2024
First publish date
1999
Last updated
2024-10-22
Published on
2024-10-22T10:04:43.803975

To determine whether a create operation of a given object is being replicated through user journal processes or through system journal processes, do the following:

  1. On the Data Group Activity Entries (WRKDGACTE) display, locate the entry for a create operation that you want to check. Create operations have a value of T-CO in the Code column.

  2. Use option 5 (Display) next to an activity entry for a create operation.

  3. On the resulting details display, check the value of the Requires container send field.

 If *YES appears for an activity entry representing a create operation, the create operation is being replicated through the system journal.

If *NO appears in the field, the create operation is being replicated through the user journal.