To display the step status for the most recently started (last run) of a procedure, do the following:
-
Display a list of procedures. See Accessing the Work with Procedures display.
-
From the Work with Procedures display, type
14
(Procedure status) next to the procedure you want and press Enter. -
The Work with Procedure Status display appears. Type 8 (Step status) next to the procedure you want.
Note: The last run procedure is at the top of the list. For *NODE procedures, all nodes are
included so the *NODE procedure at the top of the list may not be for the node you
want.
For detailed information about status for steps and procedures, see the Assure MIMIX Operations book.