Displaying step status for the last started run of a procedure - assure_mimix - 10.0

Assure MIMIX Administrator Reference

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Administrator Reference
Copyright
2024
First publish date
1999
Last updated
2024-10-22
Published on
2024-10-22T10:04:43.803975

To display the step status for the most recently started (last run) of a procedure, do the following:

  1. Display a list of procedures. See Accessing the Work with Procedures display.

  2. From the Work with Procedures display, type 14 (Procedure status) next to the procedure you want and press Enter.

  3. The Work with Procedure Status display appears. Type 8 (Step status) next to the procedure you want.

Note: The last run procedure is at the top of the list. For *NODE procedures, all nodes are included so the *NODE procedure at the top of the list may not be for the node you want.

For detailed information about status for steps and procedures, see the Assure MIMIX Operations book.