Temporarily changing from RJ to MIMIX processing - assure_mimix - 10.0

Assure MIMIX Administrator Reference

Product type
Software
Portfolio
Integrate
Product family
Assure
Product
Assure MIMIX™ Software
Version
10.0
Language
English
Product name
Assure MIMIX
Title
Assure MIMIX Administrator Reference
Copyright
2024
First publish date
1999
Last updated
2024-08-27
Published on
2024-08-27T12:04:03.662993

This procedure is appropriate for when you plan to continue using remote journaling as your primary means of transporting data to the target system but, for some reason, temporarily need to revert to MIMIX send processing.

Important! If the data group is configured for MIMIX Dynamic Apply, you must complete the procedure in Checklist: Converting to legacy cooperative processing before you remove remote journaling.

For the data group you want to change, do the following:

  1. Use the procedure “Ending a data group in a controlled manner” in the Assure MIMIX Operations book to prepare for and perform a controlled end of the data group and end the RJ link. Specify the following on the ENDDG command:

    • *ALL for the Process prompt

    • *CNTRLD for the End process prompt

    • *YES for the End remote journaling prompt.

  2. Verify that the process is ended. On the Work with Data Groups display, the data group should change to show a red “L” in the Source DB column.

  3. Modify the data group definition as follows:

    1. From the Work with DG Definitions display, type a 2 (Change) next to the data group you want and press Enter.

    2. The Change Data Group Definition (CHGDGDFN) display appears. Press Enter to see additional prompts.

    3. Specify *NO for the Use remote journal link prompt.

    4. To accept the change press Enter.

  4. Use the procedure “Starting selected data group processes” in the Assure MIMIX Operations book, specifying *ALL for the Start Process prompt.